Monthly Archives: April 2012
Super Yacht Exuma
ShrinkMaster was contacted to wrap the spectacular super yacht, Exuma. The 50metre vessel was put into dry dock for maintenance work and modifications.…
George Forbes Building, Lincoln University, Christchurch
The George Forbes Office Building at Lincoln University in Christchurch was undergoing construction work when the February 2011 earthquake hit. Further aftershocks put greater time and resource pressure on the project team.…
VOLVO Ocean Race Auckland Stopover Stage
As part of the Volvo Ocean Race Village, a stage was erected on Te Whero Island Auckland’s Viaduct Basin. ShrinkMaster was asked to wrap the scaffold structure of the stage, to provide protection for expensive technical equipment and performers.…
Why ShrinkMaster is the No.1 choice for marine projects
ShrinkMaster’s Managing Director, Chris Ramsey is a qualified boat builder and avid sailor, who spent several years in Europe working on super yachts, where shrink wrap was commonly used during refit and maintenance work.…
ShrinkMaster’s Top Tips for Autumn
Daylight savings has ended and cooler temperatures are upon us. While some parts of the country have recently been treated to sunny days, we all know that winter is fast approaching. Now is the time to prepare for the frosty, …


